LEEDLEED Certification | Engineering for +45°C
Mexicali exceeds 48°C in summer with solar radiation of 2,400 kWh/m² annually. Baumex has built 75+ industrial buildings under these conditions over 28 years. The thermal envelope of each building is calibrated specifically for the Sonoran Desert using performance data collected in the same climate zone.

Manage a temperature delta of up to 24°C between the exterior and the operational interior of your Mexicali industrial building. Insulation panels with R-19 in walls and R-30 in the roof. 100% perimeter sealing at all loading docks. Reflective roofing with a Solar Reflectance Index (SRI) above 78 — reducing roof surface temperature by up to 30°C.
Gulfstream 550K (52,200 m²) operates in Mexicali with 3,200 tons of minimum-consumption air conditioning distributed across 42 air handling units, a TPO roof with a 20-year warranty, and 90% condensation water recovery. Every envelope specification was calibrated by Baumex for actual site conditions — 48°C exterior temperature and 2,400 kWh/m² annual solar radiation.
Access 28 years of thermal performance data from industrial buildings in Mexicali. A miscalculation in the envelope of a building at 48°C drives HVAC costs 30% to 50% above the original design (ASHRAE 90.1). Baumex calibrates these specifications with decades of execution in the same zone — 75+ buildings with real operational data.
Operate your Mexicali industrial building with a thermal envelope that earns LEED credits and withstands the 48°C desert heat. 30 international corporations already operate in Grupo Nelson parks with these specifications. Request a consultation for your project.
Sources: ASHRAE 90.1 (Energy Standard for Buildings) · LEED v4.1 Energy & Atmosphere Credits · Project data: Gulfstream 550K, Baumex (2024-2026)